Road Construction/Closures & Pothole Complaints

Milling & Paving 7:00 a.m. – 5:00 p.m.
7/27 – 8/1 Walters Brook Drive from Milltown Road to Vanderveer Road
7/30 Adamsville Road N. from Rt. 22 to end
7/31 – 8/3 Vanderveer Road from Milltown Road to Murphy Drive
8/2 – 8/7 Thruway Drive from Talamini Road to Garretson Road
8/7-8/8 Meadow Road from Great Hills Road to Township Boundary
8/8-8/9 Brown Road from Tall Oaks Drive to Papen Road
8/9 – 8/10 Adamsville Road N. from Rt. 28 to E. Main St. & Adamsville Road S. from E. Main St. to Central Ave.
8/10 – 8/13 Foothill Road from Finderne Ave. to Chimney Rock Rd.
* All schedules are subject to change weather permitting

US 202/206 at I-287: Be advised that on or about June 1, 2018 NJDOT will begin making improvements on Route 206 southbound in the vicinity of the I-287 southbound ramp. Work will be concentrated between the Garretson Road and Commons Way overpasses, which will require temporary traffic patterns and intermittent detours. The contractor is expected to work 7:00AM to 3:30 PM weekdays for a duration of 6 months.

Finderne Ave: Somerset County Bridge No. G0803 on Finderne Avenue (CR 633), located between Union Avenue (Rt 28) and Foothill Road (near Rt 22), will be under construction for the next 9 months.  The new bridge will be reconstructed in three separate stages, with through vehicular and pedestrian traffic maintained throughout the project.  One lane northbound and one lane southbound will be maintained, with the exception of single day closures as required by the work.

Starting Tuesday, February 20, 2018, Stage 1 traffic control will be implemented at the center portion of Finderne Avenue, to allow for the demolition and replacement of the center portion of the existing bridge.  Through traffic northbound/southbound will utilize the right lanes in each direction;  motorists should follow the posted signs through the construction zone.  The duration of Stage 1 (center work zone) will be approximately 3 months.

At intermittent times during the project (approximately once per month), a full road closure at the bridge with a posted detour will be implemented during off-peak daytime hours between 9AM and 3PM at various times during construction.  Underground utility relocations at and adjacent to the project limits also will be performed during construction.

The County will provide updates during construction to provide advance notice for the various staged traffic shifts and nighttime detour schedules.


Click here for the NJDOT website link for more information.

Click here for the Somerset County website link for more information.


Pothole Complaints

Click Here to report a pothole on a State Highway.

Click here to report a pothole on a County Road.

Click here to report a pothole on a Township Road.

Or call Police Communications: 
908-722-4111 x 0

Bridgewater Township Police Department © 2018 Frontier Theme